§ 67.1-5-2. Wastewater Discharge Permit Contents.  


Latest version.
  • (a)

    Wastewater discharge permits (both individual and general permits must contain:

    (1)

    A statement that indicates the duration of the permit and its expiration date.

    (2)

    A statement that the permit is nontransferable without prior notification to and written approval from the County, in accordance with Section 67.1-5-5, and further, that the current User is responsible for furnishing the new User with a copy of the existing permit.

    (3)

    Applicable effluent limits, including Best Management Practices based on Federal, State and County standards.

    (4)

    A statement of self-monitoring, sampling, reporting, notification and record keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on Federal, State and County law.

    (5)

    A statement of the applicable penalties for violation of the pretreatment standards and requirements.

    (6)

    Requirements for the reporting of any instance of noncompliance by the permittee to the Director, including slug discharges.

    (b)

    Permits may also contain, without limitation:

    (1)

    Limits on the instantaneous, daily and monthly average and/or maximum concentration, mass, flow or other measure of pollutant discharge.

    (2)

    Requirements for the installation of pretreatment technology or the construction of appropriate containment devices that are designed to reduce eliminate or prevent the introduction of pollutants into the POTW. Waste minimization plans may be required.

    (3)

    Requirements for the development and implementation of spill/slug control plans or other special conditions, including management practices, necessary to adequately prevent accidental, unanticipated, or non-routine discharges.

    (4)

    The unit charge or schedule of User charges and fees for the management of the wastewater discharged to the POTW.

    (5)

    Compliance schedules for meeting pretreatment standards and requirements.

    (6)

    A statement that compliance with permit terms does not relieve the permittee of responsibility for compliance with all applicable Federal and State pretreatment standards, including those which become effective during the term of the permit.

    (7)

    Requirements for the installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices.

    (8)

    Local Limits for the receiving POTWs when required by agreement between the Director and receiving jurisdiction.

    (9)

    Such additional conditions as are deemed necessary by the Director to ensure compliance with this ordinance. (44-09-67.1.)